Risk Assessment Tools for Use During Fabrication of Offshore Structures and in Marine Operations Projects

[+] Author and Article Information
Ove Tobias Gudmestad

Statoil, 4035 Stavanger, Norway and Stavanger University College, Box 2557, 4091 Ullandhaug, Norwaye-mail: otg@statoil.com

J. Offshore Mech. Arct. Eng 124(3), 153-161 (Aug 01, 2002) (9 pages) doi:10.1115/1.1492825 History: Received July 01, 2001; Revised February 01, 2002; Online August 01, 2002
Copyright © 2002 by ASME
Your Session has timed out. Please sign back in to continue.

References

Gudmestad, O. T., Rettedal, W. K., Aarum, T., and Vegge, A., 1994, “Use of Risk Analysis in Offshore Construction Projects,” Proc. OMAE 94, Houston, I , pp. 417–432.
Anon., 1999, “Jacket System Suffers at Sea,” Offshore Engineer, Nov., pp. 13–14.
Anon., 1999, “Lives Lost as Loaded Heavy Lift Ship Capsizes,” Offshore Engineer, Nov., p. 5.
Gudmestad, O. T., and Bjerke, P. E., 1999, “Uncertainties in Weather Forecasting, a Risk to Offshore Operations,” Proc. of ISOPE Conf., Brest, II , pp. 375–380.
Anon., 1999, “Module Plunges Puts Brakes on Petronas,” Offshore Engineer, Jan., p. 5.
Annon., 1999, “Gulf of Mexico,” Pet. Eng. Int., pp. 43 and 46.
Anon., 1999, “Texaco Evaluating Options for Petronas Continuation,” Offshore, Jan., p. 58.
Gudmestad, O. T., Gordon, R., Bellamy, L. J., and Rettedal, W. K., 1997, “The Role of Human and Organizational Factors (HOF) in the Fabrication, Installation and Modification (FIM) Phases of Offshore Facilities,” Proc. of 7th Int. Conf. on Structural Safety and Reliability, ICOSSAR, Kyoto, 3 , pp. 2057–2068.
Stølsnes, R. R., Gudmestad, O. T., and Bea, R. G., 2001, “On the Importance of Human and Organizational Factors in Design, Construction and Installation of Engineered Systems,” Proc. of ISOPE 2001, Stavanger, IV , pp. 465–474.
Jacobsen, B., 1992, “The loss of Sleipner A Platform,” Proc. of ISOPE, San Francisco, CA, pp. 1–8.
Rettedal, W. K., Gudmestad, O. T., and Aarum, T., 1993, “Design of Concrete Platforms after Sleipner A Sinking,” Proc. of OMAE 93, Glasgow, pp. 309–319.
Norwegian Petroleum Directorate: “Acts, Regulations and Provisions for the Petroleum Activity,” 2 , NPD, Stavanger, latest issue and Norwegian Petroleum Directorate, “Regulations concerning Load bearing Structures in the Petroleum Activities,” Issued by NPD, Stavanger, Norway on 7 Feb 1992, latest issue to apply.
Pate-Cornell,  E. M., 1990, “Organizational Aspects of Engineering System Safety: The Case of Offshore Platforms,” Science, 250, pp. 210–217.
Trbojevic,  V. M., Bellamy,  L. J., Brabazon,  P. G., Gudmestad,  O. T., and Rettedal,  W. K., (1994) “Methodology for the Analysis of Risks During Construction and Installation Phases of an Offshore Platform,” J. Loss Prevention Process Indust., 7(4), pp. 350–359.
Lakats, L., Gudmestad, O. T., Skjæveland, H., Rettedal, W. K., and Gausel, E., 1998, “Managing Offshore Platform Construction Taking into Account ‘Bad News;’ A Case Study,” Paper WA06.4 Presented at Institute for Operations Research and the Management Sciences, National Meeting, Montreal, Quebec.
Rettedal, W. K., and Gudmestad, O. T., 1995, “Acceptance Criteria for Risk in Offshore Construction Projects,” Proc. of OMAE 95, Copenhagen, I B , pp. 67–75.
Guedes Soares, C. (ed.), 1998, Risk and Reliability in Marine Technology, Balkema.
Gudmestad, O. T., Rettedal, W. K., Sand, S., Brabazon, P. G., Trbojevic, V., and Helsøe, E., 1995, “Use of Simulator Training to Reduce Risk in Offshore Marine Operations,” Proc. of OMAE 95, Copenhagen, II , pp. 513–521.
Gudmestad,  O. T., and Løset,  S., 1998, “Risk Assessment Procedures Related to Designs of Ships and Offshore Structures in Ice,” Journal of Navigation and Hydrography (Russian Journal), 6, pp. 18–21 (English) and pp. 22–26 (Russian).
Hopkins, J. S., 1994, “The Assessment of Forecast Accuracy: Some Risk Considerations for an Offshore Operation,” Marine Advisory & Consultancy Service. UK Met. Office. Report prepared for Four Elements, London.
Nilsen,  T. N., Gudmestad,  O. T., Dalane,  J. I., Rettedal,  W. K., and Aven,  T., 1998, “Utilisation of Principles from Structural Reliability in Quantitative Risk Analysis. Example from an Offshore Transport Problem,” Reliability Eng. Sys. Safety, 61, pp. 127–137.
Brabazon, P. G., Hopkins, J. S., and Gudmestad, O. T., 1996, “Estimating the Likelihood of Weather Criteria Exceedance During Marine Operations,” Proc. of OMAE 96, II , pp. 23–28.
Hopkins, J. S., 1997, “The Accuracy of Wind and Wave Forecast,” Marine Advisory & Consultancy Service, UK Met. Office. Report OTH483, Issued by UK Health and Safety Executive, London.
Hjøllo, B. Ȧ., and Myklebust, R., 1997, “Validering av Bølgevarsler for Ekofisk, Prognosedøgn 0 til 7,” DMNI Report VpV01/1997, Bergen (in Norwegian).
Teixeira, J. C., Abreu, M. P., and Guedes Soares, C., “Variability of Ocean Wave Hindcasts due to Wind Models,” Proc. of 12th Int. Conf. on Offshore Mechanics and Arctic Engineering, C. Guedes Soares, et al. (ed.), OMAE, II , pp. 125–133.
Holthuijsen,  L. H., Booij,  N., and Bertotti,  L., 1996, “The Propagation of Wind Errors Through Ocean Wave Hind Casts,” ASME J. Offshore Mech. Arct. Eng., 118(3), pp. 184–189.
Sebastião,  P., Soares,  C. Guedes, and Booij,  N., 2000, “Wave Hind Casting off the Coast of Portugal,” Coastal Eng., 40, pp. 411–425.
Rettedal, W. K., 1999, “Quantitative Risk Acceptance Criteria in View of Two Bayesian Models,” pp. 1309–1314, ESREL 99, Schuller and Kafka (eds.), Balkema, Rotterdam.
Health and Safety at Work Act, 1974, London, HMSO.
Trbojevic, V. M., Bellamy, L. J., Gudmestad, O. T., Aarum, T., and Rettedal, W. K., 1996, “Assessment of Risk in the Design Phase of an Offshore Project,” Proc. of OMAE-96, Florence, II , pp. 431–435. (Also presented at Risk Assessment of Offshore Installations, Conf. organized by ERA Technology, London, November 1997.)
Holand, I., Gudmestad, O. T., and Jersin, E., 2000, Offshore Concrete Structures Design Guide, E&FN Spon, London.
Aven,  T., and Poern,  K., 1998, “How Should We Express and Interpret the Results of Quantitative Risk Analysis,” Reliability Eng. Sys. Safety, 61, pp. 3–10.
Swain, A. D., and Gutterman, H. E., 1983, A Handbook on Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications, NUREG/CR-1298, Nuclear Regulatory Commission, Washington, DC.
Bellamy, L. J., Kirwan, B., and Cox, R. A., 1986, “Incorporating Human Reliability Into Probabilistic Risk Assessment,” Proc. of 5th Int. Symp. on Loss Prevention and Safety Promotion in the Process Industries, Societé de Chimie Industrielle, Paris, I , pp. 6-1–6-20.
Safety and Reliability Directorate, 1988, “Human Reliability Assessors Guide,” SRD Report RTS 88/5Q, P. Humphreys (ed.), UK Atomic Energy Authority, Culcheth.
Hunns, D. M., and Daniels, B. K., 1980, The method of paired comparison, Proc. of 6th Symp. on Advances in Reliability Technology, Report NCSR R23, UK Atomic Energy Authority, Culcheth, pp. 31–71.
Kristiansen, S., Koster, E., Schmidt, W. F., Olofsson, M., Guedes Soares, C., and Caridis, P., 1999, “A New Methodology for Marine Casualty Analysis Accounting for Human and Organisational Factors,” Proc. of Int. Conf. on Learning from Marine Incidents, London, paper 14, pp. 1–14.
Guedes Soares, C., Teixeira, A. P., and Antão, P., 2000, “Accounting for Human Factors in the Analysis of Maritime accidents,” Foresight and Precaution, M. Cottam, D. Harvey, R. Pape, and J. Tait (eds.), Balkema, Rotterdam, pp. 521–528.
OREDA, 1992, Offshore Reliability Data, 2nd edition, OREDA participants.
Zolotukhin, A. B., and Gudmestad, O. T., 2000, “Use of Fuzzy Set Theory in Qualitative and Quantitative Risk Assessment,” Proc. (on CD-ROM) of SPE 5. Int. Conf. on Health, Safety and Environment, Stavanger.
Aven,  T., and Rettedal,  W. K., 1998, “Bayesian Frameworks for Integrating QRA and SRA Methods,” Struct. Safety, 20, pp. 155–165.
Rettedal,  W. K., Aven,  T., and Gudmestad,  O. T., 2000, “Integrating QRA and SRA Within a Bayesian Framework When Calculating Risk in Marine Operations. Two Examples,” ASME J. Offshore Mech. Arct. Eng., 122(3), pp. 181–187.
Guedes Soares, C., Vinnem, J. E., and Faber, M., 1995, “On the Integration of Quantified Risk Assessment and Structural Reliability in the Offshore Industry,” Proc. of European Safety and Reliability Conf. (ESREL ’95), I. A. Watson and M. P. Cottam (eds.), Chameleon Press Ltd, London, I , pp. 49–68.
Trbojevic, V. M., and Guedes Soares, C., 2000, “Risk Based Methodology for a Vessel Safety Management System,” Foresight and Precaution, M. Cottam, D. Harvey, R. Pape, and J. Tait (eds.), Rotterdam, Balkema, pp. 483–496.
Hollobone, H., 1979, “Risk Analysis of Diving Operations from Dynamically Positioned Vessels,” Dept. of Energy Offshore Technology Report, OT-R-7958.

Figures

Grahic Jump Location
Probability that a weather threshold will be exceeded
Grahic Jump Location
Acceptance criteria in a Qualitative Risk Analysis
Grahic Jump Location
Deck structure placed on the transport barge in the towing operation

Tables

Errata

Discussions

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related Journal Articles
Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In