0
TECHNICAL PAPERS

Unified Approach to Risk-Based Inspection Planning for Offshore Production Facilities

[+] Author and Article Information
Michael Havbro Faber, Daniel Straub

Swiss Federal Institute of Technology, Institut für Baustatik und Konstruktion, ETH Hönggerberg, HIL E32.3, Zürich, 8093, Switzerland

Jean Goyet

Bureau Veritas, Marine Division, 17 bis, Place de Reflets, La Défense2, 92400 Courbevoie, Francee-mail: jean.goyet@bureauveritas.com

J. Offshore Mech. Arct. Eng 125(2), 126-131 (Apr 16, 2003) (6 pages) doi:10.1115/1.1555116 History: Received July 01, 2001; Revised May 01, 2002; Online April 16, 2003
Copyright © 2003 by ASME
Your Session has timed out. Please sign back in to continue.

References

Figures

Grahic Jump Location
Illustration of the integrated structure/process system RBI analysis
Grahic Jump Location
Illustration of the analysis flow in the generic RBI planning
Grahic Jump Location
Annual failure probabilities given a threshold plan (10−4) for a component with CDF 1 and a detail with FDF 2
Grahic Jump Location
Inspection times for a target annual probability of failure of 10−4
Grahic Jump Location
Expected total cost of inspection plans for different maximum annual probabilities of failure (thresholds)

Tables

Errata

Discussions

Some tools below are only available to our subscribers or users with an online account.

Related Content

Customize your page view by dragging and repositioning the boxes below.

Related Journal Articles
Related eBook Content
Topic Collections

Sorry! You do not have access to this content. For assistance or to subscribe, please contact us:

  • TELEPHONE: 1-800-843-2763 (Toll-free in the USA)
  • EMAIL: asmedigitalcollection@asme.org
Sign In