395 Multi-Objective Optimization of Power Plant Maintenance Projects Based on NSGA-II
By
Yu-Jiong Gu
,
Yu-Jiong Gu
Key Laboratory of Condition Monitoring and Control for Power Plant Equipment of Ministry of Education,
North China Electric Power University
, Beijing, 102206
, China
Search for other works by this author on:
Zhi-Zheng Ren
,
Zhi-Zheng Ren
Key Laboratory of Condition Monitoring and Control for Power Plant Equipment of Ministry of Education,
North China Electric Power University
, Beijing, 102206
, China
; rzzgoodluck@163.com
Search for other works by this author on:
Kun-Liang Chen
,
Kun-Liang Chen
Key Laboratory of Condition Monitoring and Control for Power Plant Equipment of Ministry of Education,
North China Electric Power University
, Beijing, 102206
, China
Search for other works by this author on:
Dong-Chao Chen
Dong-Chao Chen
Key Laboratory of Condition Monitoring and Control for Power Plant Equipment of Ministry of Education,
North China Electric Power University
, Beijing, 102206
, China
Search for other works by this author on:
Page Count:
8
-
Published:2011
Citation
Gu, Y, Ren, Z, Chen, K, & Chen, D. "Multi-Objective Optimization of Power Plant Maintenance Projects Based on NSGA-II." International Conference on Computer Technology and Development, 3rd (ICCTD 2011). Ed. Zhou, J. ASME Press, 2011.
Download citation file:
Reducing power plant maintenance costs is an important way to improve the power enterprises production efficiency, for the current situation that maintenance assessment index is too single and the problem of high complexity is difficult to solve by common maintenance optimization methods, power plant multi-objective maintenance projects optimization model is established and solved by a method of fast-non-dominated-sorting genetic algorithm with elitist strategy (NSGA-II) in this paper. This method overcomes the previous problem of single optimizing assessment index and improves the efficiency and robustness of the problem solving efficiency. By the case study of a 300MW power unit electric feed...
Abstract
Key Words
1. Introduction
2. Multi-Objective Optimization Model of Power Plant Maintenance Projects
3. Multi-Objective Optimization of Power Plant Maintenance Projects Based on NSGA-II
4. Case Study
5. Conclusion
References
This content is only available via PDF.
You do not currently have access to this chapter.
Email alerts
Related Chapters
A Collaborative Framework for Distributed Multiobjective Combinatorial Optimization
International Conference on Computer and Computer Intelligence (ICCCI 2011)
A New Metaheuristic Based on Deterministic Finite Automaton for Multi-Objective Optimization of Combinatorial Problems
International Conference on Computer and Computer Intelligence (ICCCI 2011)
GA Based Multi Objective Optimization of the Predicted Models of Cutting Temperature, Chip Reduction Co-Efficient and Surface Roughness in Turning AISI 4320 Steel by Uncoated Carbide Insert under HPC Condition
Proceedings of the 2010 International Conference on Mechanical, Industrial, and Manufacturing Technologies (MIMT 2010)
A Learning-Based Adaptive Routing for QoS-Aware Data Collection in Fixed Sensor Networks with Mobile Sinks
Intelligent Engineering Systems through Artificial Neural Networks, Volume 20
Related Articles
Multi-Objective Optimization of Thermo-Ecological Criteria-Based Performance Parameters of Reheat and Regenerative Braysson Cycle
J. Energy Resour. Technol (July,2021)
Multi-objective Optimization of Conceptual Rotorcraft Powerplants: Trade-off Between Rotorcraft Fuel Efficiency and Environmental Impact
J. Eng. Gas Turbines Power (July,2015)
Thermo-Economic Assessment and Multi-Objective Optimization of an Innovatively Designed District Cooling System in Saudi Arabia
J. Energy Resour. Technol (July,2021)